approval request
Our model is currently under construction, we have orientated plans, elevations and sections, and, modelled the basic structure of the ground level. Also we are pending approval. We hadnt anticipated the diffuculty in attaining plans for the design, due to its rather recent construction. In the end we had to pay and subscibe to Architecture Week for a year to get our hands on some working drawing, these are the plans they gave us after subscribing.
Labels: academy of science, approval, APPROVED, first_stage_development, Ground Floor Plan, North Elevation, pending, section, Upper level Plan
Mitchell Wagstaff/ Will Vink BUILDING



We have decided to do The Museum for art @ Berkeley University. The architects are Toyo Ito.
Labels: approval, pending, Urgent Action Required
Peabody Essex Museum
The building was have chosen to model is the Peabody Essex Museum in Salem, Massachusetts, USA by Moshe Safdie.
With discussing between the group (Anthony, Jason, Scott) we have decided to divide it up as show in the image. Myself (yellow) and Scott (red) are doing a part of the atrium each with some of the building while Jason (blue) is going to model the remainder. This is divided up evenly by complexity, meaning the atrium has greater detail then the remainder of the building so requires more time to model.

Labels: approval, APPROVED, Peabody Essex Museum, pending
University of Michigan Museum Of Art Expansion.Ann Arbor< MI,USA.
Due to NOT aproved last building to model, We would like to try this Museum,
please we will wait for aproval and comments, thanks...
more information
Total area: 53,000 square feetConstruction start: September 2006
Client: Architect: Allied Works ArchitecturePrincipal: Brad CloepfilAssociate architect: Integrated Design Solutions, Troy, Michigan. 



Group: Ahmed mohamed and paul Takabiri
Labels: approval, he, pending
Crocker art Museum

Is anyone doing the crocker art museum?
Labels: approval, pending
teamfunkyfresh
After being not approved for our last choice we, (Anthony, Jason, Scott) have decided on the National Museum of Saudi Arabia by Moriyama & Teshima Architects.
Labels: approval, pending, teamfunkyfresh
Erica and Amanda, building approved?


We have now changed our building to the Bigelow Chapel. We have just received files from the firm, HGA Architects and are looking into how we will equally split the building.
Labels: approval, Bigelow Chapel, pending
Santo Volto di Gesù
This is the building myself and Jess Kayser would like to do, the Santo Volto di Gesù.
Heres some sweet as images:
Labels: approval, pending, Santa Volto de Gesu, Santo Volto di Gesù
Renzo Piano per Padre Pio

Author: Irace, Fulvio. Source: Abitare 2005 Jan., n.446, p.[82]-[91]
Last journal, article in Italian but helpful english footnotes for images and drawings.
Close up images of roof and skylights are interesting in how light travels to the interior of the building.
Section showing the whole progression and upper and lower level of building.
Labels: approval, Padre Pio, pending, plan, section
Grand Rapids Art Museum, Michigan
having gained pdf images of floor plans and section from WhyArchitecture, we have been able to take these in to Adobe Illustrator and then export them to DWG format. This means that they can be brought up in all 3 CAD packages and allow floor plans to be drawn over the top once the correct scale is achieved.
Labels: DWG, illustrator, pdf, pending
Brandhorst Museum
ok Rhys and I are doing the Brandhorst Museum in Mucich, Germany,
http://www.museum-brandhorst.de/en/visitor-information.html, it was designed by Sauerbruch & Hutton Architects. We will be modelling it in Revit as this is the program we both know least about therefore providing a greater challange. Unsure which spaces we will model at the moment, have all plans and photos needed to start tho so are getting underway with the modelling
Labels: approval, pending
teamfunkyfresh
So we've found a building which we would like to model.The building is known as the museum of contemporary art, Helsinki, The architect is Steven Holl.


Labels: approval, gamma, NOTAPPROVED, pending, teamfunkyfresh
Grand Rapids Art Museum, Michigan
Having only emailed WhyArchitecture about the Grand Rapids Art Museum last night. I have received information and access to an ftp site allowing me to download the drawings which will make modelling the building a lot easier.
Labels: ftp, GRAM, pending, WhyArchitecture

Matt and I will be doing the Grand Rapids Art Museum, Michigan USA.
Have yet to decide who will model which parts, but has heaps of different interior galleries that are all naturally lit.

Labels: pending
Third and FINAL building change!!!!!!
Maria and I are finally satisfied with our building choice of:
- Oscar Dominguez Museum and Cultural Centre -
which is also known as: Tenerife Espacio De Las Artes (TEA).
The building is in Santa Cruz and was designed by Herzog and de Meuron.
We have all the plans, sections, elevations AND photographs we need.
The museum is part of a large complex all within the building designed by Herzog and de Meuron... we will be modelling the whole thing.
It has some interesting facade treatments which create unique penetrations of daylight - should get some great renders!
We have decided how we will be dividing it up.
We have a journal which contains the construction drawings, as well as images of a model that was made by the architects.
Labels: approval, Oscar Dominguez Museum and Cultural Centre, pending, TEA, Tenerife Espacio de las Artes
Full steam ahead
Jacob has done a great job of finding the plans and sections for our building. We would recommend you to email the occupants of the building you've chosen if you can: In our case, we were given full elevations/sections/plans with images of the working model.
Awes!
We have decided to use ArchiCAD and will split the building up over the weekend.
Labels: Alpha, approval, pending
The Church of Padre Pio

Sally and I have found numerous photos and plans/elevations/sections from journal search in the library.
Also a book entirely devoted to the building.
Today we went through the drawings to try and understand how the building fits together.

We have been dicussing how we would divide the building up and have decided to start building the main elements together and then spliting up the remainder as we both become more confident with the model!
We have yet to decide on which programme to use...?
Labels: approval, Padre Pio, pending
Zac and Niall


We want to do the new Auckland Art Gallery.
It hasnt been built yet, it will finish in 2011 i think which is one reason why we find it so interesting.
We have also emailed the Architects about working drawings and waiting for reply.
Zac & Niall
Labels: approval, pending
Museum of Television & Radio

Tom and Huong are decided to model this museum, another museum of
Richard Meier. We think archicad might be a good programe to use.
Labels: approval, pending
Duncan and Matt's Choice
We are looking at doing Daniel Libeskind's Royal Ontario Museum in Canada. There it is:
http://www.gothereguide.com/royal+ontario+museum+toronto-place/ We're still looking for good plans and sections...
Labels: approval, pending
erica and amanda change back
Ok we actually still want to do the original builidng we were looking at, Bigelow Chapel,
http://www.hga.com/the_latest/press_releases/bigelow_chapel_011105.htmlMainly because its of a scale where we can model the entire builidng in intricate detail.
Labels: approval, pending
Rhineland Regional Museum


Maria and I are considering modelling the Rhineland Regional Museum in Bonn, Germany - by Architektengruppe Stuttgart.
Labels: approval, Architektengruppe Stuttgart, Bonn, pending, Rheinisches Landesmuseum, Rhineland Regional Museum
New Museum of Contemporary Art

Brad and Erika here taking up the challenge of the New Museum (New York) by Kazuyo Sejima & Ryue Nishizawa / SANAA
We have also come across a book with plans and sections of the NMOCA which will hopefully help exponentially with the modeling of it. CAD program still not decided upon, though the split shouldn't be too hard, most likely we will be taking a few levels each.
More at a later date, Brad B and Erika W
Labels: approval, New Museum of Contemporary Art, NMOCA, NMOCA_Building_Choice, pending, SANAA
Amanda and Erica
We're looking at modelling the Grand Rapids Art Museum,
http://www.artmuseumgr.org/uploads/assets/HB.pdf for images.
Going to go and look for plans now.
Labels: pending
From group of "Bole He & Yerim Chang"


"The Pulitzer Foundation for the Arts" from Tadao Ando is the building we select.
Labels: approval, pending, The Pulitzer Foundation for the Arts
The Nelson-Atkins Museum of Art

Equipt with confirmation, Jacob Whitehead and Kate Walker will be tackling this 'un!
Steven Holl Architects, 1999 : All up on in Missouri, Kansas
Labels: Alpha, approval, pending
Kunsthaus Graz - emma and Te Ari

Revit this!!!
Labels: approval, pending
Kunstmuseum Stuttgart

Simon Richmond and I are doing the Kunstmuseum in Stuttgart, by Hascher Jehle Architektur. Can we please have this confirmed. cheers
Labels: approval, APPROVED, bbsc303, DELTA, DELTA_plans+information, kunst, kunstmuseum stuttgart, pending